Discussion on Treatment Technologies for Mud Pumping Disease in Ballastless Track Subgrade

Authors

  • Hao Tang China Railway Siyuan Survey And Design Group Co.,LTD,China

DOI:

https://doi.org/10.61360/BoniGHSS252018270405

Keywords:

ballastless track, subgrade mud pumping, roadbed, grouting

Abstract

With the rapid development of high-speed railways, ballastless track, as an advanced track structure, plays a crucial role in providing high-speed and highly stable transportation services. However, over time, issues such as mud pumping disease have emerged in ballastless track structures, posing serious threats to track stability and operational safety. To address this problem, this paper combines practical case studies to thoroughly investigate treatment technologies for mud pumping disease in ballastless track subgrades, with a focus on the application of grouting technology. The study first evaluates the effectiveness of grouting through on-site core drilling and ground-penetrating radar (GPR) detection, followed by comparative analysis to verify its efficacy in improving subgrade stability and restoring support capacity. Experimental results demonstrate that after grouting treatment, track vibration amplitude significantly decreases, train running stability improves markedly, and no new mud pumping issues are observed in subsequent inspections.

References

Liu, M. S., Luo, Q., Guo, J. H., et al. (2019). Mechanism of mud pumping in ballastless track subgrade and optimized design of subgrade drainage. Journal of Beijing Jiaotong University, 43(3), 16–25.

Liu, J., & Cui, G. Q. (2021). Optimization of remediation techniques for mud pumping in ballastless track subgrade surface layer. Subgrade Engineering, (04), 194–198.

Zhang, Z. Y. (2021). Optimization of polyurethane lifting technology for mud pumping in high-speed railway ballastless track subgrade. Railway Standard Design, 65(9), 52–56.

He, X. H., Ni, G. Z., Zhao, H. S., et al. (2024). Polymer grouting technology for settlement remediation of ballastless track in tunnels. Transportation Enterprise Management, 39(3), 79–81.

Han, B. W., Cai, G. Q., Su, Y. L., et al. (2025). Experimental study on mechanism and dynamic characteristics of mud pumping in ballasted track subgrade under intermittent loading-wetting coupling effects. Chinese Journal of Rock Mechanics and Engineering, 44(1), 69–80.

Li, H. N. (2023). Technical analysis of mud pumping remediation in operational railway subgrades. Sichuan Cement, (03), 260–262.

Wang, W., Yang, W. H., Yang, C. Z., et al. (2022). Parametric sensitivity and uncertainty analysis of mud pumping in railway subgrades. Journal of the China Railway Society, 44(12), 105–113.

Ding, Y., Jia, Y., Wang, X., et al. (2022). Effects of particle gradation and initial dry density on mud pumping characteristics of subgrade. Rock and Soil Mechanics, 43(9), 2539–2549.

Downloads

Published

2025-06-25

Issue

Section

Research Article

How to Cite

Discussion on Treatment Technologies for Mud Pumping Disease in Ballastless Track Subgrade. (2025). Journal of Global Humanities and Social Sciences, 6(4), 152-157. https://doi.org/10.61360/BoniGHSS252018270405